Saudi power plant selects Torishima pumps

The 2400 MW combined cycle power plant, under construction in Ras Al Khair, 200 km northwest of Damman, will have five blocks, with two heat recovery steam generators (HRSGs) installed in each.

Torishima will supply six boiler feed pumps, two 100% condensate pumps and two 12.5% condensate pumps for each of the blocks.

Torishima secured the order from a consortium formed by Saudi Arabia’s AL ARRAB Contracting Co and China’s SEPCO III.