Share

Related Links

  • Thompson Pump
  • Elsevier Ltd is not responsible for the content of external websites.

Related Stories

  • Tsurumi in wastewater upgrade at a Bulgarian military training base
    Japanese pump supplier Tsurumi has upgraded a European army base. This is part of an ongoing development to the site using a mix of aerators, agitators, cutters, decanters and sewage pumps.
  • Control of chemical dosing in wastewater treatment
    Various wastewater treatment processes require the controlled dosing of chemicals into the process stream either to assist the treatment or to remove undesirable elements. In order for the dosing pumps to work efficiently, works operators need to be constantly aware of what is happening in the treatment process so that dosing levels and speeds can be adjusted accordingly. UK-based Partech Instruments has developed feed forward control systems employing on-line analysers in the inlet stream to send real-time data to a dosing control system for automatic adjustment of the dosing pump. Bryan Orchard reports.
  • Climate change, the water cycle and AC drives
    Climate change, increasing demands on water due to global urbanization and the legal obligations under the EUs Water Framework Directive are making the water sector an attractive place for technologies that can help reduce costs and contribute to reducing the effects of climate change. Here Heikki J. Kervinen of ABB discusses the influential role AC drives can play in meeting these challenges.
  • Matching demands for the most with the least
    Large buildings are prone to enormous variations in their water use. Any new system would need to match these variations using the least amount of energy. Here's how the world's largest commercial building met this challenge with a system that will not only pay for itself on energy-savings, but will also pay the costs to replace itself in its lifetime.
  • New heights reached in concrete pumping
    In April 2008, a new world record height of 606 m for pumping concrete was set on the Burj Dubai Tower in Dubai. Bryan Orchard looks at the high pressure peristaltic or piston pump technology behind this level of performance and the contribution that it can make to the latest generation of high-rise building projects.

Top 5 Stories

Feature

Dewatering three acres with 13 pumps

24 February 2009
Thompson Pumps

A construction site in the US required a five-month a dewatering project. When the banks of the final cut proved unstable and the project ran into problems, Thompson Pumps had to work fast to install extra pumps and solidify the excavation floor – which ensured a successful outcome.

A three-acre site has been put in place for the constructionof an Oriented Strand Board (OSB) Plant in Fairfax, South Carolina, USA. As part of the development of the site, Wabi America, the general contractor, worked with dewatering expert Thompson Pump on an extensive, five-month dewatering project. Don Polzin, Thompson Pump sales representative from the company's Charleston, branch, worked closely with general contractor Wabi America to prepare the site for constructionof the plant. It needed to be a concrete cast in place structure spanning 40 ft wide, 150 ft long, 6 ft thick and containing 300,000 lbs of steel. Before this extensive foundation could be built, an area 52 ft below natural ground elevation had to be cleared. Thompson Pump worked in four stages, utilizing 13 pumps and pumping an average of 1.3MGD.

The first stage of the project took three days to install and utilized two, 550 ft by 8 in wellpoint systems with one 12 in rotary pump on each system and one backup pump. Within a week, the area was 18 ft deeper. As this first system was installed, Don Polzin was instructed to discharge the water to a ditch over a quarter mile away from the press pit. Instead of running individual piping for each of the stages into the ditch, he created a collection pit 400 ft away from there using a Thompson 8 in jet pump to discharge the water 1200 ft through a 6 in Thompson Galvanized Pipe line to the ditch.
Stage two involved installing two 450 ft by 8 in systems with one Thompson 12 in rotary pump on each system and a backup pump. After a week during which the stage two pumps ran throughout, the area was another 18 ft deeper, totaling 36 ft of clearance in 10 days.
 
Stage three began successfully with two 350 ft by 6 in systems utilizing another 12 in rotary pump on each system and one backup. Despite being benched down to a depth of 36 ft, subject to 36 ft feet of static head, and discharging through 500 ft of Thompson galvanized pipe, these pumps were quickly reaching the original target depth of 47 ft.
 

An unexpected challenge

At 44 ft deep the contractor was faced with an unexpected challenge. A soft, impermeable layer of clay, 5 ft thick, was shelving water past the wellpoints and providing severe instability for the banks of the final cut. It took time to install more shallow points, jet in some sand wicks, and find a successful solution. Thompson installed a rocked French drain around the grade perimeter of the final slope and placed a 4 in vacuum-assisted pump and backup pump to keep the French drain sumped out at its lowest point. The clay layer made the centre of the excavation floor too soft and unsuitable for building. To remedy this, a fourth stage was installed that solidified the excavation floor. Utilizing one Thompson 12 in rotary pump with 50 ft of static head and 540 ft of discharge piping, stage four had the area ready for building within a week.
After the area was cleared to 52 ft below natural ground elevation, a 2 ft layer of stone was poured across the entire excavation floor and a 1 ft mud mat was laid. Six weeks later, the stage four system was buried in concrete and the pump was removed. After nearly five months, 195 million gallons of water was pumped through a 3,150 ft wellpoint system and 3,600 ft of Thompson galvanized pipe to complete the foundation of the OSB Plant.

 