Constructing a massive off-shore liquid gas project required transporting temporary living quarters to the site by barge. During loading, the barge had to remain at a constant level with the wharf. To...
Torrential rain waterlogged building works at a road in Prague, causing a deep crater to appear. A pump solution was needed which could deal with the emergency situation. Two vacuum assisted...
The largest civil engineering project in Ireland entailed building a road tunnel under a roaring tidal river. The massive components had to be prepared in advance and floated into place. This involved...
Recent floods in Prague have required the implementation of control measures to protect the historic city from contamination from flooding and the threat of raw sewage escaping from surcharged...