The new closed drain pumps are for the Main Gas Pipeline project, a component of its Lower Zakum Long-Term Development Plan (LTDP-1) to enhance field production.
NPCC is ADNOC’s procurement contractor in Abu Dhabi.
ADNOC recently revised its specifications, elevating quality, witnessing, and testing procedures throughout the manufacturing cycle. Leveraging its two-decade-long relationship with ADNOC and NPCC, Amarinth worked closely with its supply chain to integrate additional quality checks and rigorous testing procedures as mandated by ADNOC, whilst ensuring adherence to delivery schedules.
The order comprises three API 610 OH2 12th Edition drain pumps featuring Plan 53B seal support systems. Manufactured in Alloy 625 with Type 3.2 certification and non-destructive examination (NDE), the pumps also require IECEx certification. Equipped with pressure transmitters for pre-emptive issue detection, the order encompasses a mobile top-up trolley, nitrogen charging kit, warehouse spares, and a certified lifting beam for installation assistance.
Oliver Brigginshaw, managing director of Amarinth, said: “We are delighted to fulfil this latest order from NPCC. With two decades of collaboration with NPCC and ADNOC, we possess an in-depth understanding of ADNOC’s requirements and specifications. We welcome the enhanced quality and testing procedures ADNOC has introduced, both for our manufacturing process and for our supply chain partners.”