Alfa Laval’s Marine Division has secured a SEK70 million order to supply Framo pumping systems to an FPSO (Floating Production, Storage and Offloading) vessel to be built in China.
The order comprises marine pumping systems for crude oil offloading, slop, produced water, off-spec oil and ballast pump duties. Deliveries are scheduled for 2019.