The Buenos Aires wastewater treatment plant which will install the ABS pumps and mixers, will serve approximately 8 million residents.
Peter Aru, president, ABS Group said: “There is a great need for water treatment and that need is increasing throughout the world. This is a significant order that further strengthens our position in the region.”